For the week ending May 31, 2013: The following traffic advisory includes road construction and major maintenance projects requiring lane restrictions and/or closures along the state and federal highway system within ODOT District 9. For statewide information regarding road conditions affected by weather, construction, maintenance or accidents, visit ODOT on the web at www.Ohgo.com Districtwide


A raised pavement marker project is under way, and crews are replacing RPMs on the state highway system at various locations in the district. Traffic will be maintained in one lane with the use of flaggers and/or arrow boards when crews are at work. The project is anticipated to be completed by late spring. (#13-0083)


A districtwide herbicidal spraying project has begun, and crews are working along various routes throughout the district as weather permits. Traffic will be maintained in one lane with the use of arrow boards and/or flaggers when crews are at work. The project is anticipated to be completed by late spring. (#13-0082)


A districtwide guardrail repair project is under way, with crews replacing guardrail along various routes throughout the district as weather permits. Traffic will be maintained in one lane with the use of signals and/or flaggers when crews are at work. The project is anticipated to be completed by late summer. (#13-0121)


A pavement marking project has begun, and crews will be striping various routes on the state highway system throughout the district. Traffic will be maintained in one lane with the use of flaggers and/or arrow boards when crews are at work. The project is anticipated to be completed by early summer. (#12-0552)


A preventive maintenance project is under way on selected routes, and crews will be chip-sealing portions of S.R. 125 in Brown County; S.R. 41 in Highland and Ross counties; S.R. 372 in Ross County; and S.R. 239 and S.R. 371 in Scioto County. Throughout construction, traffic will be maintained in a rolling operation and with the use of flaggers when crews are at work. The project is anticipated to be completed in mid-summer. (#13-0195).


Scioto County


A slip repair project continues on S.R. 139 in Portsmouth. Crews are repairing a slip at the 1.20-mile marker, between Munn Street and T.R. 165 (Hinkley Hollow Road), just south of the corporation limit. Throughout construction, traffic will be maintained in one, 9-foot lane with temporary traffic signals. The project is anticipated to be completed in early summer. (#12-0566)


U.S. 52 is reduced to one, 11-foot lane in each direction between T.R. 569 (Old U.S. 52) near the S.R. 239 interchange and the Scioto River bridges at the Portsmouth corporation limit for a major rehabilitation project. The project work limits also include portions of S.R. 73, S.R. 239 and S.R. 852. Throughout construction, traffic will be maintained in one, 11-foot lane in each direction, and ramps will be reduced to 10-foot lanes. The project is anticipated to be completed in early fall 2014. (#12-3008)


As part of the U.S. 52 resurfacing project, the exit ramp (Ramp F) from U.S. 52 East to S.R. 239 North is closed for bridge rehabilitation. Motorists will have access to S.R. 239 from the off ramp; however, there will be no access to U.S. 52 East from S.R. 239, so traffic will be detoured via S.R. 73/104. The closure is anticipated to be in effect through early July, and progression of this phase of the project will be contingent upon the weather.


S.R. 73 is reduced to one, 10-foot lane for a slip repair project. The project site is located at the 8.50-mile marker, approximately 1.5 miles east of S.R. 348 at Otway and near Milt Jones Road. Traffic will be maintained in one lane with the use of temporary traffic signals. The project is anticipated to be completed in early summer. (#13-0107)